Our Projects

Arche noVa  – BMZ

– Multi-sectoral approach to strengthening the resilience of rural communities in the border regions of Gao, northern Mali, and Tahoua, Niger, affected by years of conflict and climate change; financed by BMZ – Arche nova
Period:
September 2022 to December 2025
Intervention area:
Circles of Ansongo (Bara and Ansongo), Gao (Gabero, Gounzoureye and Soni Ali Ber), Bourem (Taboye).
Area of ​​intervention:
– Food Safety
– Livelihood Water Hygiene and Sanitation (WASH)
– Social cohesion.

arche noVa – GFFO

2 – “Strengthening local capacities for climate-sensitive and universal water, sanitation and hygiene using and disseminating the green humanitarian aid approach” Funded by GFFO.
Period:
NOVEMBER 2023 to OCTOBER 2026
Intervention area:
 Circles of Ansongo (Bara and Ansongo), Gao (Gabero, Gounzoureye and Soni Ali Ber), Bourem (Taboye)
Area of ​​intervention:
– Food Safety
– Livelihood Water Hygiene and Sanitation (WASH)
– Social cohesion.

PAPSE

3 – Project to support the strengthening of construction measures and economic resilience for displaced households, refugees and vulnerable hosts in the Gao region; Financed by GIZ / German Cooperation.
Period:
December 2023 to November 2024
Intervention area:
Circles of Ansongo (Ansongo), Gao (Gao, Gabero, Gounzoureye).
Area of ​​intervention:
– Humanitarian assistance 
– Food safety 
– Protection
– Creation of community infrastructures of an economic nature.

PADRE III

4 – Decentralization and Regionalization Support Program: Funded by GIZ.
Period: for a period of 12 months (October 2023 to September 2024).
Intervention area:
Circle of Gao (Gao and Gounzoureye)
Area of ​​intervention: 
The project provides food and nutritional security support to internally displaced persons with a contribution to resilience in host communities.

PASP

5 – Stabilization and Peace Support Project: Funded by GIZ/German Cooperation.

Period:
From October 2023 to May 2024.
Area of ​​intervention:
The project intervention will consist of creating four (4) basic water supply systems and two (2) blocks of latrines
Intervention area: 
– Gao (Sosso-koira) Gounzoureye
– Soni Ali Ber (Forgho)
– Sidibe) and Ansongo (Targada)
 – AND the construction of two (2) latrine blocks in Targada and the hydraulic district.

PGLR+

– Accountable Local Governance Plus Program. Funded by SNV.
Period:
November 2021 to March 2026
Area of ​​intervention: 
– More accountable local governance
Intervention area: Gao and Ansongo circles

PASEM-2

– Livestock Sector Support Program in Mali phase 2; Financed by SNV.
Period:
From March 2024 to April 2027
Intervention area: 
– the entire region of Gao on the Haoussa side
Area of ​​intervention:
Production in the sectors (livestock meat and local milk).

UNICEF-PAFFEM

8 – The Project contributes to the promotion of access to financing for entrepreneurship and employment in Mali; Financed by UNICEF.
Period:
January to December 2024)
Area of ​​intervention:
 – Income Generating Activities (AGRs:)
 – High Labor Intensity Public Works (TPHIMO):
Intervention area:
– Circle of Gao, (Gao, Gounzoureye and Soni Ali Ber)
– Circle of Bourem (Bourem and Taboye) and Almoustrat (Tarkinte)
– Ansongo Circle (Ansongo and Barra).